Thermon PETK-10 Manuale Utente Pagina 7

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 9
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 6
Step 8
Mount the CKTES/PETK on a at surface, with expansion loop of 150 mm in the cables. Heating Cable/Cold Leads
and joint secured in place using bre xing tape. Application of tape shall allow a small degree of movement at the
joint and cables to cater for potential expansion and contraction of the pipeline. Do not over-tighten.
Step 9
Do not move the assembled CKTES/PETK for minimum 24 hours for complete curing.
Installation Instructions 6
150 mm
150 mm
Form TEP0107U-0512 © Thermon Manufacturing Co. Information subject to change.
Vedere la pagina 6
1 2 3 4 5 6 7 8 9

Commenti su questo manuale

Nessun commento